The Challenge
The project required the rerouting of Saturn Banks liquids to an existing three-phase separator, with off-gas directed to the LAPS compressor system, condensate routed to the stabilisation column, and MEG transferred into dedicated storage facilities to maintain segregation from the terminal’s primary MEG inventory.
The solution needed to integrate efficiently with the existing infrastructure while supporting long-term operational reliability and process efficiency.
Quanta EPC Solution
Quanta delivered a fully integrated engineering package from concept development through to implementation support, coordinating process, piping, instrumentation and project delivery activities within a brownfield operating environment.